| Translate 
 
   
 
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
IBU 
Consol
 |  | AUFZUGEN / LIFTS
 
Hi Residents / Anwohnern
Please pass on / Bitte weiterleiten.
D: Ich bin gerade zuruck nach Muenchen gekommen & MHG Brief 19.07
   gelesen, (29.07 an uns geliefert), wegen. Aufzug/Lift ersetzung, 
   dass verlangt Antwort bei Fri. 16. 08.  Wir haben MHG geschrieben, wir 
   brauchen ein bischen mehr Zeit zu denken, Sommerferien- und Urlaubsbedingt.
E: I just returned to Muenchen & read MHG letter of 19.07 delivered 29.07
   which asks for a signed response by Friday 16 Aug re. lifts replacement
   We wrote MHG we need a bit more time to think, re that & holiday period etc.
D: Ich habe Fragen & Vorschlage daran, aber noch nicht Zeit mit MHG
   & Nachbarn zu diskutieren & fragen. Sie auch moeglich ?
E: I have questions & suggestions, which I've had no time to
   ask, or discuss with MHG or other residents yet. Maybe you too ?
D: Ich vorschlage nicht in Eile zu unterschreiben, aber erst ideen diskutieren,
   es ist Urlaub Donnerstag & schoen wetter.  Vorschlage fuer eine Zeit ?
   oder ideen an diese Liste <holz@mailman.berklix....>
E: I suggest don't rush to sign those forms just yet, It's a holiday
   Thursday, & nice weather to discuss tomorrow.  Suggestions for a time ?
   Or send your ideas to our mail list <holz@mailman.berklix....>
Ideas / Ideen : http://www.berklix.org/holz/lift/
 D: Entschuldigen dass diess unten meist nicht in Deutsch
    ueberstezt ist, (Ausser Schraeg-Schrift) Kein Zeit !, aber wir
    koennen im mail liste oder zusammen in
    Deutsch oder English reden.
 E: Sorry this has mostly not been translated to German,
    no time, we can discuss on mail list or
    in person in German or English.
 This is to stimulate:Genuine Improvements Tenants Could Pay
    Increased Rent For, (But We Probably Will Not Get Most Unless We Discuss & Ask
    For Them)
 Echte Verbesserungs Vorschlagen :
 
      Money / Geld
        Mezzanine lifts
        with 2 Doors 2 Turen fü Zwischen-
        geschoss for some lifts. 
        
          ( Doors both sides for split
          level floors, as seen from same lift manufacturer since
          1985 between Tengelmann & garage ) Wie zwischen
          Tengelman & tiefgarageAll residents & visitors see our non mezzanine
          lifts (where you have to walk up half a floor) as cheap
          & hard on disabled people (wheel- chairs, crutches,
          bad backs etc), & moving baby prams, furniture &
          shopping, suitcases, beer crates, dish washers, washing
          machine, big TVs etc.Lift replacement time is ideal to cut a new door in
          concrete, opposite entrance door.Optionally also cut 2 new doors to cellar levels.
          (Once a lift with metal doors is installed at real ground
          level, it may not cost so much more to cut 2 more, this
          is ideal time for it.
        Top 4th Floor: Hoechste 4.
        EtageIs it planned to extend lift ? Or will it still end at 3rd
        ?
 
          Modern lifts no longer require head- room for winding
          wheels above the lift with cable connecting to roof; eg
          some lifts now have hydraulic cylinders at sides, with a
          wheel above cylinder, & cable connected to floor, see
          improved design on some MVV  etc.
          Presumably others could have wheels each side at top of
          shaft, with a loop over, connected to base of lift.
        
        If not Mezzanine, fit aDeeper Tiefer lift
 Not smaller as when lift at Holz- str
        19 was replaced.
 
          Example lift: (Gall & Heckelmann, 450 Kg / 6
          Personen, Baujahr 1984, Fabr 8178307.) Measurements
          suggest ~ 32 cm at back of shaft is unused, after
          allowing same space as at front for clearances. More
          space for big wheel- chairs, baby prams, furniture.(Some wheel- chairs can be big, with foot rests in
          front & or small wheels behind &/or motorised.
          Winzerer-str (cheap rental block) lift in 1985 had lifts
          better than ours, window & back doors un-lockable by
          haus-meister, (to prevent overcrowding by excess humans),
          to take occasional larger furniture etc. Not a new idea
          even in 1985 !E: A deeper lift would take more furniture, less up
          stair by hand by removal firms, less damage to walls.D: Tiefer lfit (wegen 2 Turen) wuerd grosse meuble stuck
          nehmen, mit als neben effekt, weniger beschaedigung an
          Treppe Wanden.
        More Air ! Mehr Luft !Air Slots: Present lift has 4 x 3 x 19cm long x ~ 2.5 mm
        wide. No air moves.
 
          What improvement will the new one offer ? Old one is
          inadequate to even remove smells, & if trapped in
          lift with up to 6 people the oxygen would run out fast.
          (English lifts decades back already had a trap door in
          roof to escape by & or get more air if trapped.) (Air
          fans will fail if power fails).
        
        Softer Doors Sanfter Turen: 
        
          Will the doors have decent pressure sensitive doors along
          entire door length ? Not our present painful doors, &
          not the dumb 2 hole system with 2 red light beams, which
          is cheap & works but poorly for vertical humans with
          oblique legs in office blocks, & worse for fragile
          home equipment & shopping & children."Sicherheitsturen" Im brief, also wermutlich Ja  - aber Welche Art ? 
           See New lift
        Emergency number "Notrufsysteme" 
        
          What better contact will we have in an emergency than now
          ? None at present except orange button & loud-
          speaker. 
           See New lift 
      Conclusion:Costs attributable for _genuine_ improvements can be
      contributed to by tenants.What Improvements will be purchased with our extra
      rent money ?Welche Verbesserungen wuerde mit unser extra miet Geld
      gekauft ?
        A correct percentage of costs for mere replacement due to
        fair wear & tear should be paid from owner's
        accumulated reserves on rent charged since 1985. 
        
          Emergency contact details & TUV Stempel safety
          certificate were removed from lift months back,
          suggesting lift replacement may be largely to reduce
          maintenance cost after usage for 28 years; which is not
          "Improvement" chargeable to tenants but replacement
          repair chargeable to owners IMO.( Maybe the old lift maintenance company put in a
          higher bid to continue maintaining old lifts, which MHG
          may have declined, triggering replacement rather than
          maintenance ? )
        Charging 76% of lift replacement cost to tenants as
        `Improvement' seems High:Warum sollen mieter 76% zahlen ? Meist ist ersetzungen
        arbeit, nicht wirklich verbesserungen ?
 
          Surely most of the cost should have been covered by
          the normal sinking fund for normal building maintenance.
          Why after 28 years rent since 1985 is so little money
          there for Instandsetzung ?Have owners perhaps mistakenly withdrawn too much
          income, & not set aside enough rent over the years
          for eventual repairs, (which is their responsibility, not
          tenants) ?Or did garage repair cost so much ? That derived from
          poor initial construction practice , & concrete
          corrosion inc. lack of tar round drains that was obvious
          but left to get worse for years. Not tenants' fault if
          the Instandsetzung fund ran low paying for repairs.I don't know if the books have been inspected by
          tenants to look at general maintenance costs ? I've been
          here since '85 but not my speciality, I'm an
          EngineerTenants should contribute to components of cost that
          are genuine improvement, but not costs of replacement
          necessitated by normal usage. How much if any of 76% cost
          proposed will be to pay for genuine improvements as above
          ? Not just replacement/repair ?That New lifts will be quieter (by
          numerically how much is not stated in db ?) & more
          energy efficient, may be misleading. It's probably
          impossible to buy new lifts of poor 1984 quality now.
          Claiming to replace the lifts as 76% tenant chargeable
          "Improvement" does not seem very plausible. 
      Any Other Questions Observations Notes You Have ?If we are to have new lifts we should
      ensure we get worthwhile improvements, not replacement lifts
      merely quieter & energy saving but lacking other Features.Will proposed extra rent money Actually buy Improvements
      ? Which ? or is this extra rent mostly for replacement cheap
      lifts with minimal improvements that should be paid for by
      owners, not tenants ? Andere Fragen / Bemerkungen / Info Sie Haben ?
 
      Post to the mail list  quickly please,
      as we don't want to inconvenience MHG by causing delay, but
      it would be nice to assemble a list of questions in German to
      ask MHG.
    Several people answered quickly within hours to mail list, & to door, & by phone, with
    questions & facts & opinions. Thanks to all! , A few
    notes from that:
 
      
        A new lift can be seen at Holz-Str 19. 
        
          To access if no key, go through garage level 2.Made by Kone - German Site It has an
          EcoDisc badge (FWIW?).
 
Apparently cutting concrete (eg as
      would be needed for a door) tends to cost about 1000 Euro per
      metre.It would be necessary to check the Static, (I
      guess remaining concrete would be strong enough ? but I'm an
      electronic turned computer engineer, not a structural
      engineer).Probably a lot of the steel is already ordered.
      (maybe no big deal, most or all still needed ?, just
      more for 2nd door etc ? Biggest hindrance I guess might be to
      get planners to rethink, but if planners happen to have not
      asked users who will Pay, till a project is completely
      planned & finalised, that would be planners' failure, not
      our problem) |